ANALISIS PENGARUH SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) SERTA RISK MANAGEMENT TERHADAP KINERJA PELAKSANAAN PROYEK KONSTRUKSI PADA MASA PANDEMI COVID-19 (Studi Kasus : Proyek Jalur Ganda KA St. Batu Tulis Antara Batu Tulis-Lintas Bogor-Sukabumi).
Text
Agatha Rama Sanjaya-187011327-skripsi-2022.pdf
Restricted to Repository staff only
Download (2MB) | Request a copy
Agatha Rama Sanjaya-187011327-skripsi-2022.pdf
Restricted to Repository staff only
Download (2MB) | Request a copy
Item Type: | Thesis |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Depositing User: | UPT Perpustakaan Uniba |
Date Deposited: | 29 May 2023 01:41 |
Last Modified: | 29 May 2023 01:41 |
URI: | https://repository.uniba-bpn.ac.id/id/eprint/2719 |