ANALISIS PERCEPATAN PROYEK DENGAN METODE TIME COST TRADE OFF (TCTO) PADA PEKERJAAN PRESERVASI JALAN MAYOR (Studi kasus di KUARO – KERANG, Kalimantan Timur ).
HELDA TCTO ori-skripsi.pdf
Restricted to Repository staff only
Download (3MB) | Request a copy
| Item Type: | Thesis |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Depositing User: | UPT Perpustakaan Uniba |
| Date Deposited: | 29 May 2023 02:58 |
| Last Modified: | 29 May 2023 02:58 |
| URI: | https://repository.uniba-bpn.ac.id/id/eprint/2729 |
