ANALISIS PERBANDINGAN WAKTU DAN BIAYA MENGGUNAKAN METODE TCTO (Studi Kasus Proyek Renovasi Klinik Korpri Sepinggan Baru Balikpapan.
LISSA FEBRIYANTI.pdf
Restricted to Repository staff only
Download (6MB) | Request a copy
| Item Type: | Thesis |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Depositing User: | UPT Perpustakaan Uniba |
| Date Deposited: | 29 May 2023 03:39 |
| Last Modified: | 29 May 2023 03:39 |
| URI: | https://repository.uniba-bpn.ac.id/id/eprint/2733 |
