ANALISIS KETERLAMBATAN PROYEK MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO).
Text
NAULIA FAHMI -03. Jurnal Skripsi.pdf
Restricted to Repository staff only
Download (733kB) | Request a copy
NAULIA FAHMI -03. Jurnal Skripsi.pdf
Restricted to Repository staff only
Download (733kB) | Request a copy
Item Type: | Article |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Depositing User: | UPT Perpustakaan Uniba |
Date Deposited: | 09 Jun 2023 01:07 |
Last Modified: | 09 Jun 2023 01:07 |
URI: | https://repository.uniba-bpn.ac.id/id/eprint/2937 |