ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PROYEK TANGKI TIMBUN STUDI KASUS: PROYEK TANGKI TIMBUN PT. XYZ di KALIMANTAN TIMUR.
Eaden Ahmed Thoriq_207040011_Tugas Akhir_2024.pdf
Restricted to Repository staff only
Download (2MB) | Request a copy
| Item Type: | Thesis |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Depositing User: | UPT Perpustakaan Uniba |
| Date Deposited: | 20 Nov 2025 07:59 |
| Last Modified: | 20 Nov 2025 07:59 |
| URI: | https://repository.uniba-bpn.ac.id/id/eprint/4008 |
