ANALISIS KETERLAMBATAN PROYEK MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO) (Studi Kasus di Pembangunan Jembatan Bakungan, Kab. Kutai Kartanegara).
Text
NAULIA FAHMI -03. Skripsi Lengkap.pdf
Restricted to Repository staff only
Download (14MB) | Request a copy
NAULIA FAHMI -03. Skripsi Lengkap.pdf
Restricted to Repository staff only
Download (14MB) | Request a copy
Item Type: | Thesis |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Depositing User: | UPT Perpustakaan Uniba |
Date Deposited: | 31 May 2023 01:22 |
Last Modified: | 31 May 2023 01:22 |
URI: | https://repository.uniba-bpn.ac.id/id/eprint/2751 |