ANALISIS KETERLAMBATAN PROYEK MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO) (Studi Kasus di Pembangunan Jembatan Bakungan, Kab. Kutai Kartanegara)

ANALISIS KETERLAMBATAN PROYEK MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO) (Studi Kasus di Pembangunan Jembatan Bakungan, Kab. Kutai Kartanegara).

[thumbnail of NAULIA FAHMI -03. Skripsi Lengkap.pdf] Text
NAULIA FAHMI -03. Skripsi Lengkap.pdf
Restricted to Repository staff only

Download (14MB) | Request a copy
Item Type: Thesis
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: UPT Perpustakaan Uniba
Date Deposited: 31 May 2023 01:22
Last Modified: 31 May 2023 01:22
URI: https://repository.uniba-bpn.ac.id/id/eprint/2751

Actions (login required)

View Item
View Item