ANALISIS KINERJA BIAYA DAN WAKTU DENGAN METODE EARNED VALUE ANALYSIS (EVA) PADA PROYEK KONSTRUKSI (Studi Kasus : Proyek Overlay Permukaan Runway dan Paved Shoulders di Bandar Udara Internasional Sultan Aji Muhammad Sulaiman Sepinggan - Balikpapan)

ANALISIS KINERJA BIAYA DAN WAKTU DENGAN METODE EARNED VALUE ANALYSIS (EVA) PADA PROYEK KONSTRUKSI (Studi Kasus : Proyek Overlay Permukaan Runway dan Paved Shoulders di Bandar Udara Internasional Sultan Aji Muhammad Sulaiman Sepinggan - Balikpapan).

[thumbnail of Skripsi M Rizqy 177011247-2022.pdf] Text
Skripsi M Rizqy 177011247-2022.pdf
Restricted to Repository staff only

Download (17MB) | Request a copy
Item Type: Thesis
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: UPT Perpustakaan Uniba
Date Deposited: 28 Nov 2025 00:33
Last Modified: 28 Nov 2025 00:33
URI: https://repository.uniba-bpn.ac.id/id/eprint/4438

Actions (login required)

View Item
View Item