ANALISIS KINERJA BIAYA DAN WAKTU DENGAN METODE EARNED VALUE ANALYSIS (EVA) PADA PROYEK KONSTRUKSI (Studi Kasus : Proyek Overlay Permukaan Runway dan Paved Shoulders di Bandar Udara Internasional Sultan Aji Muhammad Sulaiman Sepinggan - Balikpapan).
Skripsi M Rizqy 177011247-2022.pdf
Restricted to Repository staff only
Download (17MB) | Request a copy
| Item Type: | Thesis |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Depositing User: | UPT Perpustakaan Uniba |
| Date Deposited: | 28 Nov 2025 00:33 |
| Last Modified: | 28 Nov 2025 00:33 |
| URI: | https://repository.uniba-bpn.ac.id/id/eprint/4438 |
