ANALISA BIAYA DAN WAKTU PADA PEKERJAAN DINDING PENAHAN TANAH DENGAN MENGGUNAKAN BATU BRONJONG DAN BETON RINGAN (Studi kasus : Project PLBN Terpadu Labang, Kab. Nunukan )

ANALISA BIAYA DAN WAKTU PADA PEKERJAAN DINDING PENAHAN TANAH DENGAN MENGGUNAKAN BATU BRONJONG DAN BETON RINGAN (Studi kasus : Project PLBN Terpadu Labang, Kab. Nunukan ).

[thumbnail of Amin Afandi_207011577_2022.pdf] Text
Amin Afandi_207011577_2022.pdf
Restricted to Repository staff only

Download (5MB) | Request a copy
Item Type: Thesis
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: UPT Perpustakaan Uniba
Date Deposited: 29 May 2023 02:17
Last Modified: 29 May 2023 02:23
URI: https://repository.uniba-bpn.ac.id/id/eprint/2723

Actions (login required)

View Item
View Item