ANALISIS PEMERATAAN SUMBER DAYA TENAGA KERJA (RESOURCE LEVELLING) Studi Kasus di Proyek Persiapan Lahan Workshop PT. ALTRAK Jl. Pulau Balang KM.13 Kariangau, Balikpapan Barat.
Text
ARSYA PRAMESTI-SKRIPSI LENGKAP ARSYA.pdf
Restricted to Repository staff only
Download (12MB) | Request a copy
ARSYA PRAMESTI-SKRIPSI LENGKAP ARSYA.pdf
Restricted to Repository staff only
Download (12MB) | Request a copy
Item Type: | Thesis |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Depositing User: | UPT Perpustakaan Uniba |
Date Deposited: | 29 May 2023 02:32 |
Last Modified: | 29 May 2023 02:32 |
URI: | https://repository.uniba-bpn.ac.id/id/eprint/2724 |