ANALISIS PERCEPATAN WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN WORKSHOP (Studi Kasus Pembangunan Workshop Alat Berat, Kota Balikpapan)

ANALISIS PERCEPATAN WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN WORKSHOP (Studi Kasus Pembangunan Workshop Alat Berat, Kota Balikpapan).

[thumbnail of Fajar Agung R - 187011372 Skripsi -.pdf] Text
Fajar Agung R - 187011372 Skripsi -.pdf
Restricted to Repository staff only

Download (29MB) | Request a copy
Item Type: Thesis
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: UPT Perpustakaan Uniba
Date Deposited: 29 May 2023 02:48
Last Modified: 29 May 2023 02:48
URI: https://repository.uniba-bpn.ac.id/id/eprint/2727

Actions (login required)

View Item
View Item