IMPLEMENTASI SISTEM POWER BACK-UP MENGGUNAKAN GENERATOR SET KOMATSU EGS-630 KAPASITAS 500 kVA DI PT PAMAPERSADA NUSANTARA DISTRIK ERRKA.
Text
Skripsi_Ferry Dwi Ananda_187030640.pdf
Restricted to Repository staff only
Download (3MB) | Request a copy
Skripsi_Ferry Dwi Ananda_187030640.pdf
Restricted to Repository staff only
Download (3MB) | Request a copy
Item Type: | Thesis |
---|---|
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Depositing User: | UPT Perpustakaan Uniba |
Date Deposited: | 15 May 2024 07:25 |
Last Modified: | 15 May 2024 07:25 |
URI: | https://repository.uniba-bpn.ac.id/id/eprint/3273 |