Analisis Waktu Dan Biaya Pada Proyek Pembangunan Pasar Induk Senaken Kabupaten Paser Dengan Metode Time Cost Trade Off (TCTO)

Analisis Waktu Dan Biaya Pada Proyek Pembangunan Pasar Induk Senaken Kabupaten Paser Dengan Metode Time Cost Trade Off (TCTO).

[thumbnail of Skripsi Amelia Putri Erfaliani 197011420-2024.pdf] Text
Skripsi Amelia Putri Erfaliani 197011420-2024.pdf
Restricted to Repository staff only

Download (23MB) | Request a copy
Item Type: Thesis
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: UPT Perpustakaan Uniba
Date Deposited: 17 Nov 2025 01:01
Last Modified: 17 Nov 2025 01:01
URI: https://repository.uniba-bpn.ac.id/id/eprint/3769

Actions (login required)

View Item
View Item