Implementasi Building Information Modeling (BIM) 5D Pada Proyek Konstruksi (Studi Kasus Pada Proyek Pembangunan Resto Manggar).
Skripsi 2024 Liem ruwady.pdf
Restricted to Repository staff only
Download (11MB) | Request a copy
| Item Type: | Thesis |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Depositing User: | UPT Perpustakaan Uniba |
| Date Deposited: | 17 Nov 2025 03:15 |
| Last Modified: | 17 Nov 2025 03:15 |
| URI: | https://repository.uniba-bpn.ac.id/id/eprint/3796 |
